• EY Stand – COP28 2023

    cop28-ey-stand-exterior-branding-2023

    At COP28 in Dubai, Evolution Technical was appointed by Proud Robinson to provide a complete audio, video and lighting solution for the EY exhibition stand.


    The project required two distinct technical environments: a professional presentation area designed for corporate communication, and an immersive room that engaged visitors through synchronized multimedia content. Each space demanded a tailored AVL solution that balanced performance, reliability and integration with the stand design.

    The Challenge


    The exhibition stand needed to accommodate both formal presentations and immersive brand storytelling within a busy exhibition environment.


    The presentation space required high-quality audio and visual performance while overcoming ambient noise from the exhibition hall. At the same time, the immersive room needed to deliver a fully synchronised multimedia experience that surrounded visitors with dynamic video and spatial audio.


    All environments had to operate reliably throughout COP28 while remaining intuitive for event operators.

    cop28-ey-stand-digital-totem-display-2023

    The Solution


    Evolution Technical designed and installed a complete AVL system tailored to the different functional requirements of each space.


    The presentation area featured a 96-inch display supporting PowerPoint presentations and multimedia playback. Audio reinforcement was provided by L-Acoustics 5XT loudspeakers discreetly integrated into the stand walls, delivering clear and even coverage without compromising the stands design. To overcome background noise from the exhibition hall, a wireless tour guide transmitter system was incorporated as a secondary audio feed from the main console, ensuring presentations remained clear for attendees.


    The area was illuminated using CCT Scena Fresnel fixtures, providing consistent, presenter-friendly lighting throughout live sessions.


    Within the immersive room, five portrait-mounted LED displays created a wrap-around visual experience, complemented by a 5.1 L-Acoustics surround sound system that enhanced audience immersion. Multimedia playback was managed through a Watchout media server, with content triggered remotely via a wireless tablet, providing operators with flexible and responsive show control.


    By integrating professional presentation technology with immersive multimedia systems, Evolution Technical delivered a versatile exhibition environment that supported both corporate messaging and engaging visitor experiences.


    Delivery Highlights 


    • Complete audio, video and lighting (AVL) solution
    • Professional presentation space design
    • Immersive multimedia room
    • 96-inch presentation display
    • L-Acoustics 5XT loudspeaker system
    • Wireless tour guide audio transmission
    • CCT Scena Fresnel presentation lighting
    • Five portrait-mounted LED displays
    • 5.1 L-Acoustics surround sound system
    • Watchout media servers + programming
    • Wireless tablet show control
    • Technical installation, programming and commissioning
    cop28-ey-stand-interior-media-room-2023

    Outcome


    The completed EY stand successfully combined professional presentation capabilities with an immersive multimedia environment, enabling the client to communicate complex ideas while delivering an engaging visitor experience throughout COP28.


    Through carefully integrated AVL systems, reliable show control and thoughtful technical design, Evolution Technical delivered a solution that supported both corporate presentations and interactive brand engagement within one of the world's most significant sustainability events.


    Project Ecosystem


    Client:

    Proud Robinson


    Venue

    Dubai, UAE


    Evolution Technical:

    Audio Systems • Video Systems • Lighting Design • Exhibition Technology • Immersive AV • Show Control • Media Server Programming • Technical Installation & Commissioning


    Evolution Scenic:

    Custom stand build


    Evolution Furniture:

    Custom seat pads and plants

  • HIPA 12th Season Award Ceremony 2023

    hipa-awards-dubai-full-auditorium-audience-2023

    For the 12th Season of the Hamdan International Photography Award (HIPA), Evolution Technical was commissioned to design and deliver an original audio, video and lighting (AVL) concept that elevated the prestige of the awards while keeping photography at the heart of the production.


    Hosted at Dubai Opera, the ceremony required an advanced stage solution that seamlessly combined automation, video, lighting and audio into a single, immersive production. Working in collaboration with TECS, Evolution developed a technically sophisticated show environment that transformed the venue while supporting the ceremony's creative vision.

    The Challenge


    The production required complex technical systems to be integrated into a refined stage design without distracting from the award ceremony itself.


    A dynamic stage environment was needed to support multiple award presentations, performances and visual transitions while maintaining flawless synchronisation between automation, media playback and lighting. The installation also had to work within stage area of Dubai Opera, requiring careful engineering of the rigging and automation systems.


    Delivering smooth, repeatable movement of large LED screens while maintaining precise show timing demanded detailed planning and specialist technical expertise.

    hipa-awards-dubai-hipa-logo-stage-element-2023

    The Solution


    Working alongside TECS, Evolution Technical engineered a bespoke automation system that enabled LED screens to travel on both the X and Y axis (stage left to stage right and upstage to down stage) creating a dynamic and adaptable stage environment throughout the ceremony.

    A large central hero LED wall formed the visual focal point of the production. The complete system was rigged from Dubai Opera's mothergrid and fly bars, supported by Litec truss, GIS hoists and dedicated automation rails to deliver smooth, controlled movement.


    To further enhance the scenic design, Evolution fabricated a custom LED-framed stage arch, providing dramatic visual transitions and full blackout capability controlled directly by the lighting team, whilst being supported by GIS hoists and Litec truss.


    Content playback was managed using Disguise media servers, with timecode synchronisation ensuring seamless coordination between automation, video playback and lighting cues. Lighting control was delivered from GrandMA2 consoles at front of house, while DiGiCo consoles managed the event's audio system, providing exceptional clarity for presenters, performances and award announcements.


    The result was a fully integrated production where automation, lighting, audio and video operated as one unified technical system.

    Delivery Highlights 


    • Complete AVL production
    • Bespoke stage automation system
    • Automated LED screens
    • Hero LED wall installation
    • Litec truss and GIS hoist rigging system
    • Custom LED scenic arch fabrication
    • Disguise media server programming
    • Timecode synchronisation
    • GrandMA2 lighting control
    • DiGiCo audio mixing consoles
    • Technical installation, programming and commissioning
    hipa-awards-dubai-stage-curved-led-frames-2023

    Outcome


    The completed production transformed Dubai Opera into an immersive stage environment that celebrated photography through innovative technical design and seamless show execution.


    By integrating advanced automation, synchronised media playback and premium AVL systems into a single production workflow, Evolution Technical delivered a sophisticated ceremony that balanced technical excellence with creative storytelling. The project demonstrates Evolution's capability to engineer complex live event productions where automation, stage technology and precision show control are essential to the audience experience.

    Project Ecosystem


    Client:

    Hamdan International Photography Award (HIPA)


    Venue

    Dubai Opera

    Dubai, UAE


    Evolution Technical:

    Technical Production • Stage Automation • Audio Systems • Video Systems • Lighting Design • Show Control • Media Server Programming • Rigging • Technical Installation & Commissioning


    Evolution Scenic:

    Stage Build, Pre-Function Build


    Evolution Site Services:

    Power distribution

  • Global Faith Leaders Gala Dinner

    global-faith-leaders-gala-dinner-red-carpet-entrance-2023

    As part of the build-up to COP28, Evolution Technical was appointed to deliver the complete audio, video and lighting and technical production package for the Global Faith Leaders Gala Dinner at Emirates Palace, Abu Dhabi.


    Held under the patronage of ADNOC following the Global Faith Leaders' Summit, the event brought together distinguished international guests for an evening of dialogue, networking and cultural exchange. Evolution's role was to provide a seamless technical production that reflected the significance, prestige and diplomatic nature of the occasion.

    The Challenge


    Delivering technical production for a high-profile diplomatic gathering required exceptional attention to detail, reliability and presentation.


    The production needed to provide clear speech reinforcement for distinguished guests, elegant architectural lighting that complemented the venue, and discreet technical infrastructure that enhanced the atmosphere without distracting from the event itself.


    Every element of the AVL system had to remain robust throughout the evening, supporting formal proceedings while maintaining the refined ambience expected within one of the UAE's most prestigious venues.

    global-faith-leaders-gala-dinner-arabic-coffee-serving-2023

    The Solution


    Evolution Technical designed and delivered a fully integrated AVL solution tailored to the unique requirements of the gala dinner.


    Audio reinforcement was centered around a L-Acoustics Syva system with Syva Low extensions providing the main PA coverage, complemented by L-Acoustics 5XT loudspeakers for ambient fill throughout the venue. The system was powered by LA12X amplifiers, delivering exceptional clarity for speeches and programme content. HK Audio floor wedges provided discreet stage monitoring, while Shure RF wireless microphone systems ensured reliable speech reinforcement and presenter mobility.


    Lighting was designed to enhance the elegance of the venue using a combination of Astera Titan Tubes, AX5 and AX3 fixtures alongside Robe, SGM P5 and Chauvet lighting systems. All fixtures were programmed and controlled using a ChamSys MagicQ70 lighting console with Swisson Wireless DMX, providing flexible and dependable wireless lighting control throughout the event.


    Lighting towers were constructed using Litec Varitower structures, providing the required height and fixture positioning while maintaining a clean, unobtrusive appearance within the venue.


    The result was a cohesive technical production where audio, lighting and structural elements worked seamlessly together to support the event's diplomatic and interfaith significance.

    Delivery Highlights 


    • Complete audio, video and lighting (AVL) production
    • L-Acoustics Syva and Syva Low sound system
    • L-Acoustics 5XT ambient fill speakers
    • LA12X amplifier platform
    • HK Audio stage monitoring
    • Shure RF wireless microphone systems
    • Astera Titan Tubes, AX5 and AX3 lighting
    • Robe, SGM P5 and Chauvet performance lighting
    • ChamSys MagicQ70 lighting control
    • Swisson Wireless DMX system
    • Litec Varitower lighting structures
    • Technical installation, programming and show operation
    global-faith-leaders-gala-dinner-interfaith-dialogue-2023

    Outcome


    The completed production created a refined and immersive environment that reflected the prestige and international significance of the Global Faith Leaders Gala Dinner.


    By integrating premium audio systems, elegant lighting design and dependable technical infrastructure, Evolution Technical delivered a seamless production that enhanced every aspect of the guest experience while supporting the formal proceedings with professionalism and precision. The project demonstrates Evolution's expertise in delivering world-class technical production for diplomatic, government and international events.

    Project Ecosystem


    Client:

    ADNOC


    Venue

    Emirates Palace

    Abu Dhabi, UAE


    Evolution Technical:

    Technical Production • Audio Systems • Lighting Design • Wireless Audio • Architectural Lighting • RF Systems • Lighting Control • Technical Installation & Show Operation


    Evolution Scenic:

    Custom Fabrications.


    Evolution Site Services:

    Power Distribution, site buggies .


    Evolution Furniture:

    Decor and furniture.

  • Project Sourfish

    project-sourfish-dubai-2023-outdoor-stage-setup

    Created as an exclusive private celebration, "Project Sourfish" brought together internationally renowned performers for an evening of live entertainment in a bespoke event environment.


    Every element of the production was designed to deliver a premium but intimate guest experience while meeting the technical expectations of A-list artists and their touring teams.


    Evolution was entrusted with the complete Technical production, managing staging, rigging, professional audio, lighting, video playback and show infrastructure to create a system capable of supporting multiple live performances.

    The Challenge


    Unlike a traditional concert, the production combined the expectations of a major live performance with the flexibility required for a private event.


    The venue had to accommodate multiple artists, changing technical riders and rehearsals, while maintaining a polished environment for invited guests.


    With a compressed production schedule, every technical system from staging and rigging to lighting, audio and video had to be installed, integrated and fully commissioned within a single day, leaving sufficient time for rehearsals before the event.

    project-sourfish-dubai-2023-audience-view-live-show

    The Solution


    Evolution developed a purpose-built production environment centred around a Litec ground-supported stage and truss system, providing a secure platform for lighting, audio and performance equipment. Professional sound reinforcement, dynamic lighting and video playback systems were integrated into a unified production workflow, ensuring every performance was supported by reliable technical infrastructure.


    Behind the scenes, a dedicated fibre-based Luminex AVL network connected the production systems, allowing efficient signal distribution and communication between departments while providing the flexibility needed to accommodate live show changes throughout the evening.

    Delivery Highlights 


    • Delivered complete technical production for a private entertainment event.
    • Installed a Litec ground-supported stage and truss structure.
    • Designed and deployed a professional concert audio system using HK Audio line arrays and L-Acoustics amplification.
    • Supplied Shure PSM 1000 in-ear monitoring and professional stage monitoring systems.
    • Created a dynamic lighting design using Robe, Chauvet and Astera fixtures.
    • Managed lighting control through High End Road Hog consoles.
    • Delivered professional video playback systems for live show content.
    • Integrated a Luminex fibre network for AVL signal distribution and system control.
    • Completed installation, commissioning and artist rehearsals within a single production day.
    project-sourfish-dubai-2023-daytime-stage-performance

    Outcome


    Project Sourfish delivered a refined live entertainment experience that combined technical expertise with the flexibility required for a private, high-profile celebration. From rehearsals through to the final performance, every production element operated reliably, allowing artists and organizers to focus entirely on the guest experience.


    The project demonstrated Evolution's ability to deliver premium entertainment productions under demanding schedules while maintaining the production standards expected for international live performances.

    Project Ecosystem


    Client:

    Private Client 


    Evolution Technical:

    Delivered the complete technical production, including staging, rigging, professional audio, lighting, video playback, AVL networking, stage management and on-site technical support for the live entertainment programme.


    Evolution Site Services:

    Provided temporary power infrastructure, primary power distribution and secondary distribution boards (DBs) to support the concert stage, entrance feature, DJ maze and all technical production systems across the entertainment areas.

  • Underground Party ICD 2023

    icd-underground-party-dj-booth-equipment

    Held within the B2 car park at ICD Brookfield, Underground Party ICD transformed an industrial basement into an immersive underground music venue.


    Working alongside VCA Group, Evolution Technical delivered the complete audio and lighting package, creating a raw club environment that complemented the venue's exposed architectural setting while supporting an evening of live DJ performances.

    The Challenge


    Converting an operational underground car park into a temporary nightlife venue required a carefully considered technical approach. With limited power availability, restricted installation space and the need to preserve the industrial character of the location, the production had to maximise visual impact without relying on large-scale infrastructure.

    icd-underground-party-crowd-and-dj-lighting

    The Solution


    Evolution supplied a professional DJ setup featuring Pioneer CDJ-3000 players and a DJM-900 mixer, supported by a high-output HK Audio sound system that delivered powerful, balanced audio throughout the venue.


    Lighting was designed to enhance the raw aesthetic of the space rather than disguise it. Generic profile fixtures illuminated the lounge areas, while Astera Titan Tubes and AX5 uplights were strategically positioned around the structural columns to create depth, colour and dynamic architectural lighting throughout the venue. The combination of carefully controlled lighting and high-quality audio transformed the concrete environment into a vibrant underground club experience.

    Delivery Highlights 


    • Complete audio and lighting production.
    • Pioneer DJM-900NXS2 mixer + CDJ-3000 Professional DJ equipment.
    • High-output HK Audio PA system.
    • Architectural lighting design throughout the venue.
    • Astera Titan Tubes and AX5 wireless uplights.
    • Ambient lighting for lounge and guest areas.
    • Technical installation, programming and live event support.
    icd-underground-party-industrial-venue-transformation

    Outcome


    The production successfully transformed an unconventional industrial space into a high-energy underground venue while working within the site's physical and technical limitations. Through carefully integrated audio and lighting systems, Evolution created an immersive club atmosphere that enhanced the guest experience and supported an evening of seamless live performances.

    Project Ecosystem


    Client:

    VCA Group


    Venue

    ICD Brookfield – B2 Car Park, Dubai


    Evolution Technical:

    Technical Management • Audio • Lighting • DJ Systems • Architectural Lighting • Live Event Production

  • ADIPEC Awards 2022

    adipec-awards-abu-dhabi-speaker-podium-thumb-2022

    Held at the iconic Emirates Palace in Abu Dhabi, the 12th ADIPEC Awards celebrated excellence and innovation across the global energy sector.


    Hosted by ADNOC, the event required a premium audio, video and lighting solution that reflected the prestige of one of the industry's most significant awards programmes.


    Evolution Technical was appointed to deliver the complete technical solution, combining large-format LED displays, professional audio systems, architectural lighting and advanced signal control to support the awards ceremony, gala dinner and live entertainment throughout the evening.

    The Challenge


    Delivering technical production for a prestigious awards ceremony demanded a seamless integration of multiple AVL systems within one of the UAE's most prestigious venues.


    The production required high-resolution LED Screens for branded content, sponsor media and award sequences, alongside premium audio reinforcement for speeches, video playback and live entertainment. Lighting needed to enhance the stage environment while complementing the elegance of the ballroom, and every technical system had to operate reliably through a centralised network infrastructure.


    Achieving flawless synchronisation across video, lighting, audio and control systems was essential to maintaining the pace and quality of the live event.

    adipec-awards-abu-dhabi-lobby-aerial-view-2022

    The Solution


    Evolution Technical designed and delivered a fully integrated AVL solution centred around a large-format indoor LED display, driven by Watchout media servers to manage branded content, sponsor assets, presentations and seamless show transitions.


    The stage environment was enhanced using Astera Titan Tubes, Astera AX5 fixtures, Robe moving lights and Chauvet fixtures. Custom RGBWW LED cove lighting was integrated into the stage stairs, while LED beam fixtures surrounding the podium added depth and visual impact throughout the ceremony. Lighting control was managed through a GrandMA lighting system, providing precise programming and show execution.


    Audio reinforcement was delivered using an L-Acoustics KARA line array system with SB18 subwoofers, complemented by X12 front fills and stage monitors, all powered by LA12X amplifiers. A Yamaha QL5 digital mixing console with RIO stage boxes ensured clear, balanced audio for award presentations, speeches, multimedia playback and live performances.


    To provide reliable system integration, all AVL components were networked through a centralized Luminex infrastructure supporting Dante, Art-Net and AVB protocols. Redundant signal paths and real-time system monitoring ensured dependable performance throughout the event.


    The main PA and lighting systems were supported by Litec truss structures, providing clean sightlines and robust structural support while complementing the venue's elegant ballroom environment.

    Delivery Highlights 


    • Complete AVL production
    • Large-format indoor LED display
    • Watchout media server programming
    • L-Acoustics KARA line array system
    • SB18 subwoofers and X12 front fills
    • Yamaha QL5 digital audio console
    • Yamaha RIO stage boxes
    • Astera Titan Tubes and AX5 lighting
    • Robe and Chauvet performance lighting
    • RGBWW LED stage cove lighting
    • GrandMA lighting control
    • Luminex network infrastructure
    • Dante, Art-Net and AVB system integration
    • Litec truss support structures
    • Technical installation, programming and show operation
    adipec-awards-abu-dhabi-delegates-group-photo-2022

    Outcome


    The completed production delivered a seamless awards experience that matched the prestige of the ADIPEC Awards, combining exceptional audio quality, immersive lighting and dynamic visual presentation throughout the ceremony and gala dinner.


    By integrating advanced AVL technologies with a resilient network infrastructure and precision show control, Evolution Technical delivered a technically sophisticated production that celebrated industry achievement while providing a memorable experience for delegates, award winners and distinguished guests.


    Project Ecosystem


    Client:

    ADNOC


    Venue

    Emirates Palace

    Abu Dhabi, UAE


    Evolution Technical:

    Technical Production • Audio Systems • Video Systems • LED Displays • Lighting Design • Media Server Programming • Networked Show Control • Signal Distribution • Technical Installation & Show Operation


    Evolution Scenic:

    Stage and pre-function build


    Evolution Site Services:

    Power distribution